The timing of FAR's drilling programme is
always subject to change because of commercial activity, joint
venture decision making and equipment availability.
However, subject to these constraints the following
timetable is envisaged:
| PROSPECT |
PERMIT |
TIMING |
FAR EQUITY(%) |
POTENTIAL Million bbls |
| Guinea Bissau | Sinapa (Block 2) and Esperanca (Blocks 4A & 5A) | | 15 | Various |
| Eagle | California | Well suspended | 15.0 | Up to 8.8 mmbo Up to 33 BCF |
| Wild River | Wild River Project, Alberta Canada | | 29.12 | Base - 20 BCF Upside - 50 BCF |
| Offshore Senegal | Rufisque Offshore, Sangomar Offshore and Sangomar Deep Offshore blocks. | 2009/10 | 90 | Significant upside potential exceeding 1 billion barrels recoverable within the licence |
| NE Waller | Waller Texas | 2009/10 | 34 | Potential reserves in excess of 50 BCFE |
| Kakwa/Karr | Alberta | Waiting on Operator | 15 | 20 BCF |
| Offshore China | Beibu Gulf 22/12 | Pre Development 2009 | Sold | 19-27 MM BBLS discovered. |
| Doumonte | WA 254 | 2009/10 | 10.7 | 22.5 mean recoverable |
| Trefoil | T18P | Drilled 2004 | Royalty 0.09375 | New Wildcat Discovery of 200 to 300 billion cubic feet of gas and 14 to 21 million barrels of liquids "in-place". |
| Little Joe | WA-254-P | 2009/10 | 10.7143 | Up to 71 mmbbl oil in place (approx 35% estimated within WA-254-P). Est recovery 30-50%. |
| Jayasariya Lead | WA-254-P | 2009/10 | 10.71 | Unknown |
| Sage | WA 254 | Drilled March 1999. Evaluation continues | 11.25 | Oil discovery |